09152025Mon
Last updateThu, 11 Sep 2025 7pm

Advertising

rectangle placeholder


Subway drill parts arrive in town

Three wide Lowboy tractor-trailers carrying Spanish-made parts of the massive drill that will bore under downtown Guadalajara streets for Line Three of the city’s subway system backlogged traffic late Tuesday night following a long drive from Manzanillo, Colima.

A pothole to end all potholes

Imagine driving in fierce rains when the street in front of you opens up and  disappears. That’s what happened during a rainstorm on Calle Juan Alvarez in the early hours of Monday.  

The socavon (sinkhole) in the Santuario neighborhood, not far from the Federal Palace, measures six by six meters and is three meters deep.  The collapse also exposed the sewage drain running under the street.

Roadworks clog metro area

Construction of the third subway line in Guadalajara is causing continuous headaches for residents.  The latest inconvenience will be the dismantling of the pedestrian bridge at the intersection of Avila Camacho and Patria, next to Plaza Patria.